
Chapter 2: System Setup
2-1
Chapter 2
System Setup
2-1 Overview
This chapter provides a quick setup checklist to get your SuperWorkstation 7036A-T
up and running. Following the steps in the order given should enable you to have
the system operational within a minimal amount of time. If your system is not al-
ready fully integrated with a motherboard, processor, system memory etc., please
turn to the chapter or section noted in each step for details on installing specifi c
components.
2-2 Unpacking the System
You should inspect the box the SuperWorkstation 7036A-T was shipped in and note
if it was damaged in any way. If the workstation itself shows damage, you should
fi le a damage claim with the carrier who delivered it.
Decide on a suitable location for setting up and operating the SuperWorkstation
7036A-T. It should be situated in a clean, dust-free area that is well ventilated. Avoid
areas where heat, electrical noise and electromagnetic fi elds are generated. You
will also need it placed near a grounded power outlet.
Once the SuperWorkstation 7036A-T is placed in the appropriate location, slide the
locking tabs on each caster down to keep it stationary.
Warnings and Precautions!
Ensure that the caster wheels on the workstation are locked.•
Review the electrical and general safety precautions in Chapter 4.•
Use a regulating uninterruptible power supply (UPS) to protect the workstation •
from power surges, voltage spikes and to keep your system operating in case
of a power failure.
Allow the power supply units and hot-swap SATA drives to cool before touch-
•
ing them.
Komentáře k této Příručce