SC837J Chassis Manual
5-1
Chapter 5
Rack Installation
5-1 Overview
This chapter provides a quick setup for installing the chassis into a rack. Following
these steps in the order given should enable you to have the system installed within
a minimum amount of time.
5-2 Unpacking the System
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage you should le a damage claim with
the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold your chassis. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat,
electrical noise and electromagnetic elds are generated. You will also need to posi-
tion the rack near a grounded power outlet. Be sure to read the Rack Precautions
and General Server Precautions in the next section.
5-3 Preparing for Setup
The box your chassis was shipped in includes a set of rail assemblies (two inner
rails and two outer rails). and the mounting screws you will need to install the system
into the rack. Please read this section in its entirety before you begin the installation
procedure outlined in the sections that follow.
Choosing a Setup Location
•Leave enough clearance in front of the rack to enable you to open the front
door completely (~25 inches).
•Leave approximately 30 inches of clearance in the back of the rack to allow for
sufcient airow and ease in servicing.